
The Brief
Mitsubishi Electric's Little One: a smaller R290 heat pump for UK new builds, on sale in 2027
The 4 kW and 6 kW units weigh 58 kg, reach a seasonal COP of up to 4.77 at 35 C and add an odorant to the propane circuit so no protective zone is needed around the outdoor unit.