NuclearNPCIL began fuel loading at Rajasthan unit 8 on 19 September and at Kaiga unit 1 as it returns from refurbishment, while starting site work for two further Rajasthan units.
GridFraunhofer IEE, for the solar association BSW-Solar, models batteries absorbing peaks at existing transformers — and says the figure is not verified connection capacity.
PolicyA draft amendment to the Electricity Market Act puts consumption sites and storage into ranked groups where capacity is scarce; comments close on 9 October, entry into force set for 1 January 2027.
StorageTailem Bend BESS 3 and Wooreen registered in the market management system on 15 September — a step towards testing, not the same thing as commercial operation.
NuclearEDF's SMR subsidiary set out a schedule in Vienna: commercialisation before 2029, construction from 2030, first power in 2035, with a 48-month build assumed.
NuclearCyclife says the contractual strategy for taking apart Chinon A2's heat exchangers is validated after three and a half years of study, with the dismantling decree still pending.
AnalysisAustralia spilled 11.1GW on Sunday. Brazil's utility-scale module imports fell 82%. These are the same event, eighteen months apart.
PolicyEU rules require gas to flow both ways at every cross-border point. ACER agrees the market gives no signal to build it at Murfeld.
RenewablesWater absorbs everything past 630nm, so a cell built for the spectrum that survives ten metres beats what the same cell manages in air.
GridTwo records in two days on the NEM, and the same weekend set a curtailment record of 11.1GW. Both numbers describe the same system.