X-energy hires Fluor for nuclear island work at its second Xe-100 project, Cascade
Fluor already works on the Seadrift project in Texas; Cascade plans four 80 MWe reactors with room for twelve.
Contributing writer
Engineer. Reads grid data, market notices and regulator decisions, and writes down what each one changes for the people who operate and pay for the system.
Fluor already works on the Seadrift project in Texas; Cascade plans four 80 MWe reactors with room for twelve.
Executive Order 14421 lets the energy secretary block or remove foreign-made bulk power equipment; implementing rules are due by 24 December.
The Section 202(c) orders let PREPA run units it needs for capacity and keep clearing vegetation near lines from 8 November to 5 February 2027.
The Golmud demonstration project, built by CGDG with the Chinese Academy of Sciences, stores air at about minus 194 C instead of using batteries.
The new phase covers 60 GWh of pumped hydro, 30 GWh of batteries and 2 GWh of other technologies, and doubles the domestic content rule.
The agency's 2026 infrastructure report finds 22% of cross-border projects delayed each year and 60% of congestion income set aside rather than spent.
The Michigan utility puts 39 billion into its electric business for 2027-2031, citing a 1 GW Google and a 1.4 GW Oracle data centre deal.
President Tokayev backed the reserve; Kazatomprom is exploring six areas of more than 1,000 square kilometres for it.
Two releases on 2 and 4 November show Europe's binding constraint moving from generation to network capacity, at continental and local scale.
The Dutch operator says the high-voltage grid lacks capacity to connect them from January without risking reliability; it lists 14 new bottlenecks.