Grid Brief ENDE

Ford Energy and DESRI team up to deploy US-assembled battery storage built in Kentucky

D. E. Shaw Renewable Investments, known as DESRI, and Ford Energy, the energy storage subsidiary of Ford Motor Company, announced on 4 November that they will work together to deploy battery energy storage systems assembled in the United States, Energy-Storage.news reported on 6 November. The stated aim is to add dispatchable capacity to the US grid.

Ford Energy was launched in May. Its main product, the Ford Energy DC block, is a standard 20-foot containerised system built around 512Ah lithium iron phosphate cells, available in two-hour and four-hour versions. It is made at Ford's Kentucky gigafactory, which has 20 GWh of annual capacity, and is fully assembled in the US for compliance with the foreign entity of concern and prohibited foreign entity rules. Ford quotes a 20-year calendar life and an operating range of minus 35 to 55 degrees Celsius, and aims the product at short-duration services such as frequency regulation, arbitrage and demand response. First deliveries are expected in late 2027.

Energy-Storage.news notes that the 512Ah cell puts Ford in the newer 500Ah-plus class, but that CATL, EVE, REPT, Hithium and CALB already use larger 587 to 628Ah cells with container ratings around 6.25 MWh, and that Ford has not yet published efficiency or energy density figures.

DESRI, founded in 2010, has built a storage record alongside solar, including the Arroyo project in McKinley County, New Mexico, with 300 MWac of PV and 150 MW/600 MWh of co-located batteries, and the Carne project, also in New Mexico, with 130 MW of solar and 260 MWh of storage. Earlier this year it took a preferred equity stake in Linea Energy's 235 MW/470 MWh Duffy BESS in Texas.

Ford Energy and DESRI team up to deploy US-assembled battery storage built in Kentucky
Ford Energy and DESRI team up to deploy US-assembled battery storage built in Kentucky — Grid Brief

What it means

For US developers, domestic assembly is now a qualification as much as a selling point. Ford brings factory scale from the car business, but its product will be judged on the specifications it has not yet published.

Written by Victoria Shinder.