Dutch lower house tells government to draw up rules for balcony solar by next spring
The House of Representatives in the Netherlands has passed a motion requiring the government to prepare a framework for balcony solar by the spring of next year, pv magazine reported on 12 November.
The motion was tabled by Felix Klos of Democrats 66, the largest party in the house, which leads a minority government with the People's Party for Freedom and Democracy and the Christian Democratic Appeal. It asks the government for two things: a framework that allows plug-in solar systems to be connected safely, and an inventory of the standards and regulations that would have to be amended to make that possible. Representatives of 12 of the 17 parliamentary groups voted in favour.
The argument in the motion rests on who has not yet been reached. About 35% of Dutch households already have solar panels, it says, and allowing balcony systems would give more households a way to generate electricity and reduce their bills.
The text points to Germany as the reference case. Around 500 MW of the photovoltaic capacity Germany added last year came from new plug-in systems. Other countries have moved recently as well. The United Kingdom legalised balcony solar in August for customers in England, Scotland and Wales. A month later Greece allowed plug-in balcony systems of up to 800 W and standalone batteries for the first time. In Norway, Green Party members who are not part of the government proposed last month that compliant plug-in solar and batteries should be allowed to connect by the end of 2027.
A motion is an instruction from parliament, not a law. The technical and legal details will be known only when the government presents the framework and the list of standards to change.

Why it matters
With 35% of households already producing solar power, the motion is about the rest. Balcony systems are small one by one, but the German figure of around 500 MW in a year shows that they add up. The spring deadline gives the government only a few months to say how such systems can be connected safely.