Brazil's utility-scale module imports fall 82% as curtailment bites
Total imports halved to 5.48GW in the first half. The centralised segment collapsed from 2.3GW to 430MW, and prices went up 12.9% while volumes fell.
Everything we have published, newest first, from every desk.
Total imports halved to 5.48GW in the first half. The centralised segment collapsed from 2.3GW to 430MW, and prices went up 12.9% while volumes fell.
Jupiter Power closed $1.4bn across four deals for 1,500MW/3,600MWh — including a BBB− rated private placement secured on three plants already running.
The state commission ordered a mandatory construction contribution for the substations and lines that serve large loads. Microsoft has filed to keep its options open.
GEN energija published two studies before the referendum: a cooling tower choice and a transport route from Koper that needs clearance work in 112 places.
Slovenia's own figures put the same reactor at €65 or €103 a MWh. Nothing about the plant changes between those two numbers — only who lends the money, and at what rate.
Import capacity agreed at the connection stage was withdrawn after the plant was built, and the storage business case went with it.
A CUSC modification puts a price on staying in the connections queue, starting at £3,000 per MW and rising to £25,000. Consultation closes on 1 October.
Refining margins, not crude alone, are carrying the increase. EIA's breakdown shows where each dollar at the pump is going.
Four projects, AU$1.8 billion, and roughly 8% of the state's summer peak - all of it batteries, none of it gas.
Europe's assessment finds no problem in Portugal. The national one finds a shortfall growing fiftyfold by 2035. ACER's opinion is about the modelling, not the lights.