Fluence CEO Julian Nebreda and CFO Ahmed Pasha leave; Axel Meier steps in as interim CEO
The departures follow a Q3 revenue shortfall of about $90 million and a guidance cut of around $600 million tied to problems at the company's Houston plant.
Everything we have published, newest first, from every desk.
The departures follow a Q3 revenue shortfall of about $90 million and a guidance cut of around $600 million tied to problems at the company's Houston plant.
The New Mexico plant is licensed to enrich up to 10% U-235 in all its cascades; LEU+ allows longer reactor cycles and can feed HALEU production.
On the same day, PJM's backstop auction may shrink to 630 MW while a nuclear owner in the same market plans a 200 MW uprate to sell to large loads.
After FERC rejected most of the first design, PJM revised cost allocation and collateral; utilities have cut near-term large-load forecasts by 6.5 GW.
Belgium's transmission operator contracted 1.6 GW for 2028-29 and 0.8 GW for 2030-31; no two-hour batteries were selected for the later year and the 2027-28 top-up needed nothing.
The EU agency repeats its February findings even though the Slovak regulator ended the procedure on 8 October; the proposal would have raised tariffs by more than 50%.
The Final Safety Evaluation Report came on 30 October; with the environmental review done in May, the four-reactor project moves to the last stage of its construction permit.
The Japanese group is buying PCI Energy Solutions for $1.4 billion, a platform Utility Dive says manages about 60% of US power generation, and plans a components joint venture with ABB.
On its 30 October earnings call Exelon put utility-owned storage at 1.5 GW to 3.5 GW, on top of a $1 billion, 500 MW project already proposed in New Jersey.
Published on 2 November, the conditions apply to load controllers and flexibility service providers ahead of the Load Control Licence Regulations 2027, to be laid before Parliament this year.