Longi launches a 25.2%-efficient rooftop module with 98.58% active front area
Longi launched its Hi-MO X10 Full-Screen Triple-Protection module on 17 November at an industry event in Qingdao, pv magazine reported. The module keeps the 2,382 mm by 1,134 mm format of the existing Hi-MO X10 line for distributed PV but raises the light-receiving share of the front side to 98.58%, the highest Longi has reached in a commercial product. It delivers up to 680 W at 25.2% efficiency, with a standard volume-production rating of 670 W, which Longi says is 20 W above mainstream TOPCon modules of the same size.
The extra area comes from four changes worth 759.3 square centimetres in total. A low-temperature film-welding process removes the 20 white gaps between cells, three front busbars move to the rear, the spacing between strings falls from 1.48 mm to 1 mm, and the creepage distance between cells and frame shrinks from 12.9 mm to under 9 mm with upgraded insulation. Round-wire ribbons and a reshaped frame profile limit the shading the rear busbars would cause; Longi gives a maximum bifaciality of 85%.
The "triple protection" targets hotspots, arcing and microcracks on commercial and industrial roofs. Structures equivalent to bypass diodes inside each HPBC 2.0 cell are said to keep hotspots below 100 C, laser fusion welding in the junction box removes the gaps where DC arcs form, and the low-temperature welding with thinner busbars reduces mechanical stress. The warranty is 15 years on materials and 30 years on linear output, with first-year degradation of at most 1% and 0.35% a year after that.

Why it matters
The efficiency gain comes from geometry rather than a new cell: more of the same glass area produces power. The reliability claims are aimed at rooftops, where a hotspot or an arc is a fire risk on someone else's building.